Fasilitas Produksi

No Deskripsi IPA Imam Bonjol IPA Selat Panjang IPA Sei Jawi (SJL) Parit Mayor
A. INTAKE
1 Jumlah 3 Unit 1 Unit 1 Unit 1 Unit
2 Kapasitas Intake I = 600 l/dtk
Intake II = 600 l/dtk
Intake III = 300 l/dtk
300 l/dtk 55 l/dtk 300 l/dtk
3 Konstruksi Beton Permanen Beton Permanen Kayu Semi Permanen Beton Permanen
4 Pompa Air Baku Intake I = 4 x 200 l/d - H = 20 m
= 1 x 400 l/d - H = 20 m
= 1 x 150 l/d - H = 60 m
Intake II = 3 x 400 l/d - H = 20 m
Intake III = 2 x 300 l/d - H = 22 m
4 x 60 l/d – Head : 32 m
(Pompa Submersible)

3 x 55 l/d – Head : 15m
1 x 50 l/d–Head : 15 m

2 x 60 l/d–Head : 20 m
3 x 165 l/d-Head : 15 m
5 System Pemompaan Negative Suction Negative Suction Negative Suction Positive Suction
6 Pipa Transmisi ND. 300 – 600 m ND. 600 mm ND. 250 mm ND. 600 mm
7 Meter Air Baku E.Magnetic Flowmeter E.Magnetic Flowmeter E.Magnetic Flowmeter E.Magnetic Flowmeter
B. WATER TREATMENT
1 Jumlah 5 Unit 2 Unit 3 Unit 1 Unit
2 Kapasitas Total 1.408 l/dtk 300 l/dtk 50 l/dtk 300 l/dtk
3 IPA (1)/(2)/(4)/(5) – Beton
IPA (3) – Baja
IPA (1) – Baja
IPA (2) – Baja
IPA (1)/(2) – Baja
IPA (3) – Fibreglass
Beton
4 Type Konvensional Konvensional Konvensional
5 Bahan Kimia Alum – Koagulant
Kianchem – Koagulant Aid
Kapur – Netralisator
Gas Chlor – Desinfectant
Alum – Koagulant
Kianchem – Koagulant Aid
Kapur – Netralisator
Gas Chlor – Desinfectant
Alum – Koagulant
Kianchem - Koagulant Aid
Kapur – Netralisator
Kaporit – Desinfectant
Alum-Koagulant
Kianchem-Koagulant Aid
Kapur – Netralisator
Garam Halus/ foodgradenon yodium - Desinfectant
C. RESERVOIR & POMPA
1 Jumlah 4 Unit 1 Unit 2 Unit 1 Unit
2 Kapasitas Total 3.950 m3 terdiri dari:
IPA I = 600 m3
IPA 2 = 700 m3
IPA 3 = 1.000 m3
IPA 4 = 1.650 m3
100 m3 200 m3 2.000 m3
3 Konstruksi Beton Beton Beton Beton
4 Type Ground Reservoir Ground Reservoir Ground Reservoir Ground Reservoir
5 System Pemompaan Negative Suctio Negative Suctio Negative Suctio Positive Suction
6 Pompa 17 Unit 4 Unit 4 Unit 3 Unit
7 Kapasitas Pemompaan 1.379 l/dtk 250 l/dtk 60 l/dtk 300 l/dtk
8 Meter Air Produksi E.Magnetic Flowmeter E.Magnetic Flowmeter E.Magnetic Flowmeter E.Magnetic Flowmeter
D. INFRASTRUKTUR PENUNJANG
1 Jumlah 4 Unit 1 Unit 2 Unit 1 Unit
2 Kapasitas Total 3.950 m3 terdiri dari:
IPA I = 600 m3
IPA 2 = 700 m3
IPA 3 = 1.000 m3
IPA 4 = 1.650 m3
100 m3 200 m3 2.000 m3
3 Konstruksi Beton Beton Beton Beton
4 Type Ground Reservoir Ground Reservoir Ground Reservoir Ground Reservoir
5 System Pemompaan Negative Suctio Negative Suctio Negative Suctio Positive Suction
6 Pompa 17 Unit 4 Unit 4 Unit 3 Unit
7 Kapasitas Pemompaan 1.379 l/dtk 250 l/dtk 60 l/dtk 300 l/dtk
8 Meter Air Produksi E.Magnetic Flowmeter E.Magnetic Flowmeter E.Magnetic Flowmeter E.Magnetic Flowmeter
D. INFRASTRUKTUR PENUNJANG
1 Laboratorium Lengkap Terbatas Terbatas Terbatas
2 Gudang Kimia Ada Ada Ada Ada
3 Rumah Pompa Ada Ada Ada Ada
4 Catu Daya PLN & Genset 1.250 KVA PLN & Genset 250 KVA PLN PLN & Genset 670 KVA






© Sekretariat Daerah Pemerintah Kota Pontianak 2021